Article 2025

Performance barriers and competence development of graduate architects in construction contract administration (CCA): the mediating role of CCA skills

Engineering, Construction and Architectural Management
Journal · Vol. 32 · Issue 8 · pp. 5609-5637
Abstract

Purpose – Education focused on the creation of a knowledge base but not on how to bring such knowledge into practice had caused graduate architects to encounter reality shock and fail to perform during building contract administration. Although the effect of performance barriers on competence development is empirically supported, less is known about the mechanisms that explain this effect. Overcoming barriers for graduate architects is crucial while supporting building contract administrators and acquiring professional qualifications. To address this issue, we propose the mediating role of CCA skills as a possible explanation of the relationship between performance barriers and competence development of graduate architects. Design/methodology/approach – A survey was conducted among graduate architects in Klang Valley. In total, one hundred and twenty-seven usable questionnaires were returned and analyzed using descriptive analysis and regression analysis. Findings – Mediation results indicate that performance barriers have a significant positive influence on competence development through CCA skills in claims and legal matters management, project management, communication and relationship management, quality assessment and management, and design management. Originality/value – The present study contributes to the construction contract administration literature by integrating performance barriers and the CCA skills model. This advances our understanding of performance barriers and CCA skills engendering competence development of graduate architects. © 2024 Emerald Publishing Limited

Keywords

Author Keywords

Skills competence development Graduate architects Performance barriers Quantitative method

Index Keywords

Skill Regression analysis Project management Performance Architecture Knowledge based systems Building contracts Competence development Construction contract administration Contract administration Graduate architect Mediating roles Performance barrier Quantitative method
Author Affiliations
Universiti Malaya, Kuala Lumpur, Malaysia
Funding & Acknowledgements
No funding information
References 10 References
1 J Leg Aff Dispute Resolut Eng Constr, (2017)
2 Liabilities of the Contract Administrator in Certification, (2012)
3 J Leg Aff Dispute Resolut Eng Constr, (2017)
4 Agbaxode, Peter D.K., Design documentation quality influential variables in the construction sector, IOP Conference Series: Earth and Environmental Science, 654, 1, (2021)
5 Journal of Positive School Psychology, (2022)
6 Interim Interdisciplinary Journal, (2013)
7 Global Journal of Research in Engineering, (2017)
8 Alawag, Aawag Mohsen, Critical Success Factors Influencing Total Quality Management In Industrialised Building System: A Case Of Malaysian Construction Industry, Ain Shams Engineering Journal, 14, 2, (2023)
9 Fundamentals of Building Construction Materials and Methods, (2004)
10 Arditi, David A., Total quality management in the construction process, International Journal of Project Management, 15, 4, pp. 235-243, (1997)
Quick Actions
Full Text via DOI
Citation Metrics
0
Times Cited (Scopus)

References 10
Document Identifiers